Draft Project for the Construction and Operation of the expansion of the WWTP Rafelguaraf, Valencia.

Draft Project about the expansion of the WWTP in Rafelguaraf, Valencia

Draft Project for the Construction and Operation of the expansion of the WWTP Rafelguaraf, Valencia.
Markets

URBAN PLANNING , WASTEWATER TREATMENT & REUSE , ENVIRONMENTAL STUDIES & PLANNING ,

Services

ENGINEERING STUDIES CONSTRUCTION MANAGEMENT ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT

Client

Generalitat Valenciana / Consellería de Infraestructuras y Transporte

Include

Consulting, Project Management

Area

WWTP

Cost

€ 1.180.415,05

Status

Completed 2011

01 / PROJECT PERSPECTIVE

The network of the WWTP comprises the steps of:

This project consisted in the preparation of the draft Project about the expansion of the WWTP in the municipality of Rafelguaraf, Valencia. • Filter Grille, new wells and water pump, transfer of two self-cleaning strainers, new biological reactor and secondary clarifier. • Execution of the slab for mud silos, generator, hypochlorite and deodorization. • Execution of a pump well and a drain pump. • Concerning the WWTP sludge circuit, the units required are: replacing the sludge thickener, substitution of helical pumps and replacement of the band filter by a centrifuge decanter.

Draft Project for the Construction and Operation of the expansion of the WWTP Rafelguaraf, Valencia. — The network of the WWTP comprises the steps of:
02 / PROJECT PERSPECTIVE

Capacity

The design of the plant is for a daily average flow of 2500 m3 and an equivalent population of 7,500 people. The WWTP’s yield concerning the BOD5’s reduction is 96%.